QC all data (well construction, run header, g-log curves, mud/temperature).
This task is closed and unheld.
Name | |
Spud date | 1988-03-10 |
Abandon date | |
Borehole orientation | Directional |
Measured depth | 1292.000 |
True vertical depth | 1290.370 |
Tperf | 654.000 |
Bperf | 1115.000 |
Water geochem | |
No well data | |
Glog unavailable | |
Notes |
Service company | ATLAS WIRELINE SERVICES |
Tool | DUAL INDUCTION FOCUSED LOG |
Date | 1988-03-12 |
Run number | 1 |
Driller depth | 1292.000 |
Logger depth | 1292.000 |
Log bottom | 1291.000 |
Log top | 90.000 |
Casing size | 10.750 |
Bit size | 9.875 |
Mud type | GEL-POLYPAC |
Mud density | 8.90 |
Mud visc (plastic) | 46.00 |
Mud visc (funnel) | |
Mud ph | 8.20 |
Mud fluid loss | 9.20 |
Sample source | FLOWLINE |
Circulation stopped time | |
Logger on bottom time | |
Time since circulation | 2.000 |
Operating rig time | |
Notes |
58600 | 2019-01-15 14:04 | ashley | CLOSED, UNHANDED |
58600 | 2019-01-15 14:04 | ashley | EDITED RUN 1 (March 12, 1988) |
58600 | 2019-01-15 14:01 | ashley | EDITED WELL METADATA |
58600 | 2019-01-15 13:58 | ashley | TAKEN |
58600 | 2018-08-09 13:28 | e.haugen | TASK CREATED |
17084 | 2018-06-27 13:04 | ahowery | CLOSED, UNHANDED |
17084 | 2018-06-27 13:04 | ahowery | EDITED RUN 1 (March 12, 1988) |
17084 | 2018-06-27 13:02 | ahowery | ADDED RUN 1 (March 12, 1988) |
17084 | 2018-06-27 13:00 | ahowery | EDITED WELL METADATA |
17084 | 2018-06-27 12:58 | ahowery | TAKEN |
17084 | 2018-01-04 20:35 | whdc | TASK CREATED |
Well 02982092