QC all data (well construction, run header, g-log curves, mud/temperature).
This task is closed and unheld.
Name | |
Spud date | 1956-12-10 |
Abandon date | 1991-03-06 |
Borehole orientation | Vertical |
Measured depth | 1780.000 |
True vertical depth | |
Tperf | 1463.000 |
Bperf | 1775.000 |
Water geochem | |
No well data | |
Glog unavailable | |
Notes |
Service company | SCHLUMBERGER | SCHLUMBERGER | GO INTERNATIONAL |
Tool | ELECTRICAL LOG | ELECTRICAL LOG | INDUCTION ELECTRICAL LOG |
Date | 1956-12-11 | 1956-12-15 | 1970-07-10 |
Run number | 1 | 1-IS | ONE |
Driller depth | 1500.000 | 1700.000 | 1780.000 |
Logger depth | 1501.000 | 1699.000 | 1780.000 |
Log bottom | 1499.000 | 1694.000 | 1779.000 |
Log top | 149.000 | 1499.000 | 1700.000 |
Casing size | 13.375 | ||
Bit size | 12.250 | 7.625 | 5.500 |
Mud type | CLAY | CRUDE OIL | CLAY BASE |
Mud density | 78.00 | ||
Mud visc (plastic) | 70.00 | ||
Mud visc (funnel) | |||
Mud ph | 7.50 | ||
Mud fluid loss | |||
Sample source | PIT | ||
Circulation stopped time | |||
Logger on bottom time | |||
Time since circulation | |||
Operating rig time | 0.500 | 1.500 | |
Notes |
58881 | 2019-01-22 10:00 | ashley | CLOSED, UNHANDED |
58881 | 2019-01-22 10:00 | ashley | EDITED RUN ONE (July 10, 1970) |
58881 | 2019-01-22 09:57 | ashley | EDITED RUN 1-IS (Dec. 15, 1956) |
58881 | 2019-01-22 09:55 | ashley | EDITED RUN 1 (Dec. 11, 1956) |
58881 | 2019-01-22 09:52 | ashley | EDITED WELL METADATA |
58881 | 2019-01-22 09:42 | ashley | TAKEN |
58881 | 2018-08-09 13:28 | e.haugen | TASK CREATED |
20123 | 2018-07-05 11:22 | ahowery | CLOSED, UNHANDED |
20123 | 2018-07-05 11:22 | ahowery | ADDED RUN 1-IS (Dec. 15, 1956) |
20123 | 2018-07-05 11:20 | ahowery | ADDED RUN 1 (Dec. 11, 1956) |
20123 | 2018-07-05 11:16 | ahowery | ADDED RUN ONE (July 10, 1970) |
20123 | 2018-07-05 11:14 | ahowery | EDITED WELL METADATA |
20123 | 2018-07-05 11:09 | ahowery | TAKEN |
20123 | 2018-01-04 20:36 | whdc | TASK CREATED |
Well 02935350