QC all data (well construction, run header, g-log curves, mud/temperature).
This task is closed and unheld.
Name | |
Spud date | 1979-12-29 |
Abandon date | |
Borehole orientation | Vertical |
Measured depth | 1655.000 |
True vertical depth | |
Tperf | 1146.000 |
Bperf | 1615.000 |
Water geochem | |
No well data | |
Glog unavailable | |
Notes |
Service company | Schlumberger | Schlumberger |
Tool | COMPENSATED NEUTRON FORMATION DENSITY | Dual Induction-SFL With Linear Correlation Log |
Date | 1980-01-01 | 1980-01-01 |
Run number | ONE | ONE |
Driller depth | 1655.000 | 1655.000 |
Logger depth | 1655.000 | 1656.000 |
Log bottom | 1652.000 | 1650.000 |
Log top | 80.000 | 80.000 |
Casing size | 14.000 | 14.000 |
Bit size | 6.250 | 6.250 |
Mud type | LIGNOSULFONATE | LIGNOSULFONATE |
Mud density | 9.00 | 9.00 |
Mud visc (plastic) | 47.00 | 47.00 |
Mud visc (funnel) | ||
Mud ph | 10.00 | 10.00 |
Mud fluid loss | 6.40 | 6.40 |
Sample source | CIRC. | CIRC. |
Circulation stopped time | 08:15:00 | 08:15:00 |
Logger on bottom time | 10:30:00 | 09:00:00 |
Time since circulation | ||
Operating rig time | ||
Notes |
59339 | 2019-02-01 12:19 | ashley | CLOSED, UNHANDED |
59339 | 2019-02-01 12:19 | ashley | EDITED RUN ONE (Jan. 1, 1980) |
59339 | 2019-02-01 12:18 | ashley | ADDED RUN ONE (Jan. 1, 1980) |
59339 | 2019-02-01 12:15 | ashley | EDITED RUN ONE (Jan. 1, 1980) |
59339 | 2019-02-01 12:14 | ashley | EDITED WELL METADATA |
59339 | 2019-02-01 12:07 | ashley | TAKEN |
59339 | 2018-08-09 13:28 | e.haugen | TASK CREATED |
18295 | 2018-07-16 13:00 | matches3215 | CLOSED, UNHANDED |
18295 | 2018-07-16 12:58 | matches3215 | EDITED RUN ONE (Jan. 1, 1980) |
18295 | 2018-07-16 12:47 | matches3215 | ADDED RUN ONE (Jan. 1, 1980) |
18295 | 2018-07-16 12:45 | matches3215 | EDITED WELL METADATA |
18295 | 2018-07-16 12:36 | matches3215 | TAKEN |
18295 | 2018-01-04 20:35 | whdc | TASK CREATED |
Well 02960300