QC all data (well construction, run header, g-log curves, mud/temperature).
This task is closed and unheld.
Name | |
Spud date | 1965-08-15 |
Abandon date | 1993-10-14 |
Borehole orientation | Vertical |
Measured depth | 1540.000 |
True vertical depth | |
Tperf | 884.000 |
Bperf | 1538.000 |
Water geochem | |
No well data | |
Glog unavailable | |
Notes |
Service company | PAN GEO ATLAS CORP |
Tool | Induction-Electrical Log |
Date | 1965-08-18 |
Run number | ONE |
Driller depth | 1540.000 |
Logger depth | 1538.000 |
Log bottom | 1532.000 |
Log top | 52.000 |
Casing size | 11.750 |
Bit size | 10.625 |
Mud type | CLAYBASE MUD |
Mud density | 67.00 |
Mud visc (plastic) | 46.00 |
Mud visc (funnel) | |
Mud ph | 8.50 |
Mud fluid loss | 9.60 |
Sample source | FLOWLINE |
Circulation stopped time | |
Logger on bottom time | |
Time since circulation | 1.500 |
Operating rig time | |
Notes | fluid loss in cc |
59535 | 2019-02-05 13:56 | ashley | CLOSED, UNHANDED |
59535 | 2019-02-05 13:56 | ashley | EDITED RUN ONE (Aug. 18, 1965) |
59535 | 2019-02-05 13:54 | ashley | EDITED WELL METADATA |
59535 | 2019-02-05 13:50 | ashley | TAKEN |
59535 | 2018-08-09 13:28 | e.haugen | TASK CREATED |
19739 | 2018-07-24 20:11 | powen | CLOSED, UNHANDED |
19739 | 2018-07-24 20:11 | powen | EDITED RUN ONE (Aug. 18, 1965) |
19739 | 2018-07-24 20:08 | powen | ADDED RUN ONE (Aug. 18, 1965) |
19739 | 2018-07-24 20:05 | powen | EDITED WELL METADATA |
19739 | 2018-07-24 20:05 | powen | EDITED WELL METADATA |
19739 | 2018-07-24 20:01 | powen | TAKEN |
19739 | 2018-01-04 20:36 | whdc | TASK CREATED |
Well 02921976