QC all data (well construction, run header, g-log curves, mud/temperature).
This task is closed and unheld.
Name | |
Spud date | 1965-04-07 |
Abandon date | 2007-11-13 |
Borehole orientation | Vertical |
Measured depth | 890.000 |
True vertical depth | |
Tperf | 275.000 |
Bperf | 888.000 |
Water geochem | |
No well data | |
Glog unavailable | |
Notes |
Service company | PAN GEO ATLAS CORP | PAN GEO ATLAS CORP. |
Tool | Induction-Electrical Log | INDUCTION ELECTRICAL LOG |
Date | 1965-04-08 | 1965-04-09 |
Run number | ONE | TWO |
Driller depth | 840.000 | 890.000 |
Logger depth | 838.000 | 888.000 |
Log bottom | 832.000 | 882.000 |
Log top | 54.000 | 832.000 |
Casing size | 11.750 | 7.000 |
Bit size | 10.625 | 10.625 |
Mud type | CLAYBASE | CLAYBASE |
Mud density | 69.50 | 65.00 |
Mud visc (plastic) | 48.00 | 43.00 |
Mud visc (funnel) | ||
Mud ph | 8.50 | 8.40 |
Mud fluid loss | 4.60 | 4.60 |
Sample source | FLOWLINE | FLOWLINE |
Circulation stopped time | ||
Logger on bottom time | ||
Time since circulation | 1.000 | 1.000 |
Operating rig time | ||
Notes | fluid loss in cc |
59538 | 2019-02-05 17:24 | ashley | CLOSED, UNHANDED |
59538 | 2019-02-05 17:23 | ashley | EDITED RUN TWO (April 9, 1965) |
59538 | 2019-02-05 17:22 | ashley | ADDED RUN TWO (April 9, 1965) |
59538 | 2019-02-05 17:19 | ashley | EDITED RUN ONE (April 8, 1965) |
59538 | 2019-02-05 17:17 | ashley | EDITED WELL METADATA |
59538 | 2019-02-05 17:16 | ashley | TAKEN |
59538 | 2018-08-09 13:28 | e.haugen | TASK CREATED |
19806 | 2018-07-24 21:21 | powen | CLOSED, UNHANDED |
19806 | 2018-07-24 21:21 | powen | EDITED RUN ONE (April 8, 1965) |
19806 | 2018-07-24 21:19 | powen | ADDED RUN ONE (April 8, 1965) |
19806 | 2018-07-24 21:18 | powen | EDITED WELL METADATA |
19806 | 2018-07-24 21:17 | powen | EDITED WELL METADATA |
19806 | 2018-07-24 21:08 | powen | TAKEN |
19806 | 2018-01-04 20:36 | whdc | TASK CREATED |
Well 02923190