QC all data (well construction, run header, g-log curves, mud/temperature).
This task is closed and unheld.
Name | |
Spud date | 1973-01-18 |
Abandon date | |
Borehole orientation | Vertical |
Measured depth | 1300.000 |
True vertical depth | |
Tperf | 800.000 |
Bperf | 1298.000 |
Water geochem | |
No well data | |
Glog unavailable | |
Notes |
Service company | GO INTERNATIONAL |
Tool | INDUCTION ELECTRICAL LOG |
Date | 1973-01-19 |
Run number | ONE |
Driller depth | 1300.000 |
Logger depth | 1301.000 |
Log bottom | 1300.000 |
Log top | 30.000 |
Casing size | 11.750 |
Bit size | 10.625 |
Mud type | GEL-WATER |
Mud density | 69.00 |
Mud visc (plastic) | 45.00 |
Mud visc (funnel) | |
Mud ph | |
Mud fluid loss | 5.00 |
Sample source | PIT |
Circulation stopped time | |
Logger on bottom time | |
Time since circulation | 1.000 |
Operating rig time | |
Notes |
59590 | 2019-02-06 13:06 | ashley | CLOSED, UNHANDED |
59590 | 2019-02-06 13:06 | ashley | EDITED RUN ONE (Jan. 19, 1973) |
59590 | 2019-02-06 13:04 | ashley | EDITED WELL METADATA |
59590 | 2019-02-06 13:02 | ashley | TAKEN |
59590 | 2018-08-09 13:28 | e.haugen | TASK CREATED |
19737 | 2018-07-25 17:17 | powen | CLOSED, UNHANDED |
19737 | 2018-07-25 17:16 | powen | EDITED RUN ONE (Jan. 19, 1973) |
19737 | 2018-07-25 17:14 | powen | ADDED RUN ONE (Jan. 19, 1973) |
19737 | 2018-07-25 17:13 | powen | EDITED WELL METADATA |
19737 | 2018-07-25 17:10 | powen | TAKEN |
19737 | 2018-01-04 20:36 | whdc | TASK CREATED |
Well 02947612