QC all data (well construction, run header, g-log curves, mud/temperature).
This task is closed and unheld.
Name | |
Spud date | 1973-11-11 |
Abandon date | 2004-11-03 |
Borehole orientation | Vertical |
Measured depth | 1480.000 |
True vertical depth | |
Tperf | 1030.000 |
Bperf | 1478.000 |
Water geochem | |
No well data | |
Glog unavailable | |
Notes |
Service company | GO INTERNATIONAL |
Tool | INDUCTION ELECTRICAL LOG |
Date | 1973-11-12 |
Run number | ONE |
Driller depth | 1480.000 |
Logger depth | 1480.000 |
Log bottom | 1479.000 |
Log top | 32.000 |
Casing size | 11.750 |
Bit size | 10.625 |
Mud type | CLAY BASE |
Mud density | 68.00 |
Mud visc (plastic) | 44.00 |
Mud visc (funnel) | |
Mud ph | |
Mud fluid loss | 5.00 |
Sample source | CIRC. |
Circulation stopped time | |
Logger on bottom time | |
Time since circulation | 1.000 |
Operating rig time | |
Notes | fluid loss in cc |
59614 | 2019-02-06 15:59 | ashley | CLOSED, UNHANDED |
59614 | 2019-02-06 15:59 | ashley | EDITED RUN ONE (Nov. 12, 1973) |
59614 | 2019-02-06 15:57 | ashley | EDITED WELL METADATA |
59614 | 2019-02-06 15:53 | ashley | TAKEN |
59614 | 2018-08-09 13:28 | e.haugen | TASK CREATED |
20652 | 2018-07-31 16:58 | powen | CLOSED, UNHANDED |
20652 | 2018-07-31 16:57 | powen | EDITED RUN ONE (Nov. 12, 1973) |
20652 | 2018-07-31 16:54 | powen | ADDED RUN ONE (Nov. 12, 1973) |
20652 | 2018-07-31 16:50 | powen | EDITED WELL METADATA |
20652 | 2018-07-31 16:45 | powen | TAKEN |
20652 | 2018-01-04 20:36 | whdc | TASK CREATED |
Well 02948189