QC all data (well construction, run header, g-log curves, mud/temperature).
This task is closed and unheld.
Name | |
Spud date | 1974-09-03 |
Abandon date | 2005-11-10 |
Borehole orientation | Vertical |
Measured depth | 600.000 |
True vertical depth | |
Tperf | 486.000 |
Bperf | 568.000 |
Water geochem | |
No well data | |
Glog unavailable | |
Notes |
Service company | GO INTERNATIONAL |
Tool | INDUCTION ELECTRICAL LOG |
Date | 1974-09-03 |
Run number | ONE |
Driller depth | 600.000 |
Logger depth | 596.000 |
Log bottom | 595.000 |
Log top | 30.000 |
Casing size | 11.750 |
Bit size | 10.625 |
Mud type | GEL BASE |
Mud density | |
Mud visc (plastic) | |
Mud visc (funnel) | |
Mud ph | |
Mud fluid loss | |
Sample source | CIRC. |
Circulation stopped time | |
Logger on bottom time | |
Time since circulation | 0.000 |
Operating rig time | |
Notes |
59778 | 2019-02-11 15:24 | ashley | CLOSED, UNHANDED |
59778 | 2019-02-11 15:24 | ashley | EDITED RUN ONE (Sept. 3, 1974) |
59778 | 2019-02-11 15:22 | ashley | EDITED WELL METADATA |
59778 | 2019-02-11 15:20 | ashley | TAKEN |
59778 | 2018-08-09 13:28 | e.haugen | TASK CREATED |
20814 | 2018-08-03 10:55 | powen | CLOSED, UNHANDED |
20814 | 2018-08-03 10:55 | powen | EDITED RUN ONE (Sept. 3, 1974) |
20814 | 2018-08-03 10:52 | powen | ADDED RUN ONE (Sept. 3, 1974) |
20814 | 2018-08-03 10:45 | powen | EDITED WELL METADATA |
20814 | 2018-08-03 10:40 | powen | TAKEN |
20814 | 2018-01-04 20:36 | whdc | TASK CREATED |
Well 02949466