QC all data (well construction, run header, g-log curves, mud/temperature).
This task is closed and unheld.
Name | |
Spud date | 1964-03-04 |
Abandon date | |
Borehole orientation | Directional |
Measured depth | 4472.000 |
True vertical depth | 4458.000 |
Tperf | 2247.000 |
Bperf | 2730.000 |
Water geochem | |
No well data | |
Glog unavailable | |
Notes |
Service company | SCHLUMBERGER | SCHLUMBERGER |
Tool | INDUCTION ELECTRICAL LOG | INDUCTION ELECTRICAL LOG |
Date | 1964-03-07 | 1964-03-17 |
Run number | 1 | 2 |
Driller depth | 2800.000 | 4472.000 |
Logger depth | 2796.000 | 4474.000 |
Log bottom | 2795.000 | 4473.000 |
Log top | 50.000 | 2800.000 |
Casing size | 20.000 | 8.625 |
Bit size | 12.250 | 7.875 |
Mud type | CLAY WITH CAUSTIC | GEL - CAUSTIC & QUEBRACHO |
Mud density | 72.00 | 72.00 |
Mud visc (plastic) | 39.00 | 47.00 |
Mud visc (funnel) | ||
Mud ph | 8.50 | 9.50 |
Mud fluid loss | 4.80 | 5.40 |
Sample source | PIT | PIT |
Circulation stopped time | ||
Logger on bottom time | ||
Time since circulation | 2.000 | 2.000 |
Operating rig time | ||
Notes |
59830 | 2019-02-11 11:45 | ashley | CLOSED, UNHANDED |
59830 | 2019-02-11 11:44 | ashley | EDITED RUN 2 (March 17, 1964) |
59830 | 2019-02-11 11:42 | ashley | EDITED RUN 1 (March 7, 1964) |
59830 | 2019-02-11 11:40 | ashley | EDITED WELL METADATA |
59830 | 2019-02-11 11:36 | ashley | TAKEN |
59830 | 2018-08-09 13:28 | e.haugen | TASK CREATED |
21046 | 2018-08-06 06:59 | sgainer | CLOSED, UNHANDED |
21046 | 2018-08-06 06:58 | sgainer | EDITED RUN 2 (March 17, 1964) |
21046 | 2018-08-06 06:58 | sgainer | ADDED RUN 2 (March 17, 1964) |
21046 | 2018-08-06 06:57 | sgainer | EDITED RUN 1 (March 7, 1964) |
21046 | 2018-08-06 06:54 | sgainer | ADDED RUN 1 (March 7, 1964) |
21046 | 2018-08-06 06:53 | sgainer | EDITED WELL METADATA |
21046 | 2018-08-06 06:52 | sgainer | TAKEN |
21046 | 2018-01-04 20:36 | whdc | TASK CREATED |
Well 02913216