QC all data (well construction, run header, g-log curves, mud/temperature).
This task is closed and unheld.
Name | |
Spud date | 1975-12-13 |
Abandon date | 2004-12-14 |
Borehole orientation | Vertical |
Measured depth | 1120.000 |
True vertical depth | |
Tperf | 957.000 |
Bperf | 1120.000 |
Water geochem | |
No well data | |
Glog unavailable | |
Notes |
Service company | Go International | Go International |
Tool | INDUCTION ELECTRICAL LOG | INDUCTION ELECTRICAL LOG |
Date | 1975-12-17 | 1975-12-22 |
Run number | ONE | TWO |
Driller depth | 945.000 | 1120.000 |
Logger depth | 944.000 | 1119.000 |
Log bottom | 943.000 | 1118.000 |
Log top | 52.000 | 965.000 |
Casing size | ||
Bit size | 9.875 | 9.875 |
Mud type | GEL BASE | GEL BASE |
Mud density | ||
Mud visc (plastic) | ||
Mud visc (funnel) | ||
Mud ph | ||
Mud fluid loss | ||
Sample source | CIRC. | |
Circulation stopped time | ||
Logger on bottom time | ||
Time since circulation | 0.000 | 0.500 |
Operating rig time | ||
Notes |
70793 | 2019-03-07 12:28 | ashley | CLOSED, UNHANDED |
70793 | 2019-03-07 12:28 | ashley | EDITED RUN TWO (Dec. 22, 1975) |
70793 | 2019-03-07 12:27 | ashley | EDITED RUN ONE (Dec. 17, 1975) |
70793 | 2019-03-07 12:25 | ashley | EDITED WELL METADATA |
70793 | 2019-03-07 12:20 | ashley | TAKEN |
70793 | 2018-12-17 09:25 | e.haugen | TASK CREATED |
46485 | 2018-08-08 11:43 | hannaho | CLOSED, UNHANDED |
46485 | 2018-08-08 11:43 | hannaho | EDITED RUN TWO (Dec. 22, 1975) |
46485 | 2018-08-08 11:42 | hannaho | ADDED RUN TWO (Dec. 22, 1975) |
46485 | 2018-08-08 11:37 | hannaho | EDITED RUN ONE (Dec. 17, 1975) |
46485 | 2018-08-08 11:35 | hannaho | ADDED RUN ONE (Dec. 17, 1975) |
46485 | 2018-08-08 11:27 | hannaho | EDITED WELL METADATA |
46485 | 2018-08-08 11:20 | hannaho | TAKEN |
46485 | 2018-08-01 11:06 | e.haugen | TASK CREATED |
Well 02952456