QC all data (well construction, run header, g-log curves, mud/temperature).
This task is closed and unheld.
Name | |
Spud date | 1976-11-02 |
Abandon date | |
Borehole orientation | Vertical |
Measured depth | 1189.000 |
True vertical depth | |
Tperf | 655.000 |
Bperf | 1125.000 |
Water geochem | |
No well data | |
Glog unavailable | |
Notes |
Service company | Schlumberger |
Tool | DUAL INDUCTION-LATEROLOG WITH LINEAR CORRELATION LOG |
Date | 1976-11-03 |
Run number | ONE |
Driller depth | 1189.000 |
Logger depth | 1188.000 |
Log bottom | 1182.000 |
Log top | 23.000 |
Casing size | 10.750 |
Bit size | 8.750 |
Mud type | GEL |
Mud density | 68.00 |
Mud visc (plastic) | 40.00 |
Mud visc (funnel) | |
Mud ph | 11.00 |
Mud fluid loss | 9.20 |
Sample source | CIRC. |
Circulation stopped time | 03:00:00 |
Logger on bottom time | 06:00:00 |
Time since circulation | |
Operating rig time | |
Notes |
71298 | 2019-07-26 13:58 | ashley | CLOSED, UNHANDED |
71298 | 2019-07-26 13:57 | ashley | EDITED RUN ONE (Nov. 3, 1976) |
71298 | 2019-07-26 13:53 | ashley | EDITED WELL METADATA |
71298 | 2019-07-26 13:44 | ashley | TAKEN |
71298 | 2018-12-17 09:25 | e.haugen | TASK CREATED |
46990 | 2018-08-15 19:12 | powen | CLOSED, UNHANDED |
46990 | 2018-08-15 19:12 | powen | EDITED RUN ONE (Nov. 3, 1976) |
46990 | 2018-08-15 19:09 | powen | ADDED RUN ONE (Nov. 3, 1976) |
46990 | 2018-08-15 19:08 | powen | EDITED WELL METADATA |
46990 | 2018-08-15 18:48 | powen | TAKEN |
46990 | 2018-08-01 11:06 | e.haugen | TASK CREATED |
Well 02954116