QC all data (well construction, run header, g-log curves, mud/temperature).
This task is closed and unheld.
Name | |
Spud date | 1981-08-06 |
Abandon date | |
Borehole orientation | Vertical |
Measured depth | 1344.000 |
True vertical depth | |
Tperf | 968.000 |
Bperf | 1246.000 |
Water geochem | |
No well data | |
Glog unavailable | |
Notes |
Service company | GEARHART |
Tool | INDUCTION LATEROLOG |
Date | 1981-08-07 |
Run number | ONE |
Driller depth | 1344.000 |
Logger depth | 1342.000 |
Log bottom | 1341.000 |
Log top | 16.000 |
Casing size | 14.000 |
Bit size | 12.750 |
Mud type | GEL |
Mud density | 63.00 |
Mud visc (plastic) | 43.00 |
Mud visc (funnel) | |
Mud ph | |
Mud fluid loss | |
Sample source | FLOWLINE |
Circulation stopped time | 06:00:00 |
Logger on bottom time | 11:52:00 |
Time since circulation | |
Operating rig time | |
Notes |
71486 | 2019-07-30 13:10 | ashley | CLOSED, UNHANDED |
71486 | 2019-07-30 13:10 | ashley | EDITED RUN ONE (Aug. 7, 1981) |
71486 | 2019-07-30 13:06 | ashley | EDITED WELL METADATA |
71486 | 2019-07-30 13:00 | ashley | TAKEN |
71486 | 2018-12-17 09:25 | e.haugen | TASK CREATED |
63455 | 2018-11-05 07:42 | e.haugen | TASK CREATED |
47178 | 2018-08-18 21:34 | powen | CLOSED, UNHANDED |
47178 | 2018-08-18 21:33 | powen | EDITED RUN ONE (Aug. 7, 1981) |
47178 | 2018-08-18 21:33 | powen | EDITED RUN ONE (Aug. 7, 1981) |
47178 | 2018-08-18 21:30 | powen | ADDED RUN ONE (Aug. 7, 1981) |
47178 | 2018-08-18 21:28 | powen | EDITED WELL METADATA |
47178 | 2018-08-18 21:25 | powen | TAKEN |
47178 | 2018-08-01 11:06 | e.haugen | TASK CREATED |
Well 02964994