QC all data (well construction, run header, g-log curves, mud/temperature).
This task is closed and unheld.
Name | |
Spud date | 1991-02-15 |
Abandon date | |
Borehole orientation | Vertical |
Measured depth | 545.000 |
True vertical depth | |
Tperf | |
Bperf | |
Water geochem | |
No well data | |
Glog unavailable | |
Notes |
Service company | SCHLUMBERGER | SCHLUMBERGER |
Tool | SIMULTANEOUS DUAL LATEROLOG | SIMULTANEOUS COMPENSATED NEUTRON LITHO DENSITY |
Date | 1991-02-15 | 1991-02-15 |
Run number | ONE | ONE |
Driller depth | 525.000 | 525.000 |
Logger depth | 545.000 | 545.000 |
Log bottom | 530.000 | 512.000 |
Log top | 50.000 | 50.000 |
Casing size | 9.625 | 9.625 |
Bit size | 6.250 | 6.250 |
Mud type | GWL | GWL |
Mud density | ||
Mud visc (plastic) | ||
Mud visc (funnel) | ||
Mud ph | ||
Mud fluid loss | ||
Sample source | CIRC. | CIRC. |
Circulation stopped time | 15:15:00 | 15:15:00 |
Logger on bottom time | 15:15:00 | 17:00:00 |
Time since circulation | ||
Operating rig time | ||
Notes |
71499 | 2019-07-30 14:45 | ashley | CLOSED, UNHANDED |
71499 | 2019-07-30 14:45 | ashley | TAKEN |
78995 | 2019-03-19 13:53 | ashley | CLOSED, UNHANDED |
78995 | 2019-03-19 13:53 | ashley | EDITED RUN ONE (Feb. 15, 1991) |
78995 | 2019-03-19 13:51 | ashley | EDITED RUN ONE (Feb. 15, 1991) |
78995 | 2019-03-19 13:50 | ashley | EDITED WELL METADATA |
78995 | 2019-03-19 13:49 | ashley | TAKEN |
78995 | 2019-03-16 09:02 | tsowers | TASK CREATED |
71499 | 2018-12-17 09:25 | e.haugen | TASK CREATED |
47191 | 2018-08-23 07:42 | sgainer | CLOSED, UNHANDED |
47191 | 2018-08-23 07:42 | sgainer | EDITED RUN ONE (Feb. 15, 1991) |
47191 | 2018-08-23 07:41 | sgainer | ADDED RUN ONE (Feb. 15, 1991) |
47191 | 2018-08-23 07:40 | sgainer | EDITED RUN ONE (Feb. 15, 1991) |
47191 | 2018-08-23 07:38 | sgainer | ADDED RUN ONE (Feb. 15, 1991) |
47191 | 2018-08-23 07:37 | sgainer | EDITED WELL METADATA |
47191 | 2018-08-23 07:35 | sgainer | TAKEN |
47191 | 2018-08-01 11:06 | e.haugen | TASK CREATED |
Well 02986395