QC all data (well construction, run header, g-log curves, mud/temperature).
This task is closed and unheld.
Name | |
Spud date | 1985-06-29 |
Abandon date | |
Borehole orientation | Vertical |
Measured depth | 446.000 |
True vertical depth | |
Tperf | 90.000 |
Bperf | 357.000 |
Water geochem | |
No well data | |
Glog unavailable | |
Notes |
Service company | SCHLUMBERGER | SCHLUMBERGER |
Tool | DUAL IND. | LITHO DENSITY/COMPENSATED NEUTRON/GR |
Date | 1985-06-29 | 1985-06-29 |
Run number | 1 | 1 |
Driller depth | 442.000 | 442.000 |
Logger depth | 440.000 | 440.000 |
Log bottom | 434.000 | 437.000 |
Log top | 43.000 | 43.000 |
Casing size | 16.000 | 16.000 |
Bit size | 8.750 | 8.750 |
Mud type | CYPAN | CYPAN |
Mud density | 8.70 | 8.70 |
Mud visc (plastic) | 45.05 | |
Mud visc (funnel) | 45.00 | |
Mud ph | 11.00 | 11.00 |
Mud fluid loss | 10.20 | 10.20 |
Sample source | FLOWLINE | FLOWLINE |
Circulation stopped time | 12:00:00 | 12:00:00 |
Logger on bottom time | 13:00:00 | 14:00:00 |
Time since circulation | ||
Operating rig time | ||
Notes | Fluid loss in C3 | Fluid loss is in C3 |
71511 | 2019-07-30 15:32 | ashley | CLOSED, UNHANDED |
71511 | 2019-07-30 15:31 | ashley | EDITED RUN 1 (June 29, 1985) |
71511 | 2019-07-30 15:30 | ashley | EDITED RUN 1 (June 29, 1985) |
71511 | 2019-07-30 15:28 | ashley | EDITED RUN 1 (June 29, 1985) |
71511 | 2019-07-30 15:25 | ashley | EDITED WELL METADATA |
71511 | 2019-07-30 15:23 | ashley | TAKEN |
71511 | 2018-12-17 09:25 | e.haugen | TASK CREATED |
47203 | 2018-08-22 07:30 | sgainer | CLOSED, UNHANDED |
47203 | 2018-08-22 07:30 | sgainer | EDITED RUN 1 (June 29, 1985) |
47203 | 2018-08-22 07:29 | sgainer | ADDED RUN 1 (June 29, 1985) |
47203 | 2018-08-22 07:28 | sgainer | EDITED RUN 1 (June 29, 1985) |
47203 | 2018-08-22 07:27 | sgainer | ADDED RUN 1 (June 29, 1985) |
47203 | 2018-08-22 07:26 | sgainer | EDITED WELL METADATA |
47203 | 2018-08-22 07:25 | sgainer | TAKEN |
47203 | 2018-08-01 11:06 | e.haugen | TASK CREATED |
Well 02975560