QC all data (well construction, run header, g-log curves, mud/temperature).
This task is closed and unheld.
Name | |
Spud date | 1976-08-03 |
Abandon date | |
Borehole orientation | Vertical |
Measured depth | 1058.000 |
True vertical depth | |
Tperf | 473.000 |
Bperf | 1012.000 |
Water geochem | |
No well data | |
Glog unavailable | |
Notes |
Service company | Schlumberger |
Tool | DUAL INDUCTION-LATEROLOG WITH LINEAR CORRELATION LOG |
Date | 1976-08-04 |
Run number | ONE |
Driller depth | 1058.000 |
Logger depth | 1058.000 |
Log bottom | 1052.000 |
Log top | 20.000 |
Casing size | 10.750 |
Bit size | 8.750 |
Mud type | FGM |
Mud density | 71.00 |
Mud visc (plastic) | 45.00 |
Mud visc (funnel) | |
Mud ph | 8.50 |
Mud fluid loss | 9.40 |
Sample source | CIRC. |
Circulation stopped time | |
Logger on bottom time | |
Time since circulation | 1.000 |
Operating rig time | |
Notes |
71854 | 2019-08-06 15:00 | ashley | CLOSED, UNHANDED |
71854 | 2019-08-06 15:00 | ashley | EDITED RUN ONE (Aug. 4, 1976) |
71854 | 2019-08-06 14:56 | ashley | EDITED WELL METADATA |
71854 | 2019-08-06 14:49 | ashley | TAKEN |
71854 | 2018-12-17 09:25 | e.haugen | TASK CREATED |
47546 | 2018-09-02 11:13 | hannaho | CLOSED, UNHANDED |
47546 | 2018-09-02 11:13 | hannaho | EDITED RUN ONE (Aug. 4, 1976) |
47546 | 2018-09-02 11:13 | hannaho | ADDED RUN ONE (Aug. 4, 1976) |
47546 | 2018-09-02 11:07 | hannaho | EDITED WELL METADATA |
47546 | 2018-09-02 11:01 | hannaho | TAKEN |
47546 | 2018-08-01 11:06 | e.haugen | TASK CREATED |
Well 02953478