QC all data (well construction, run header, g-log curves, mud/temperature).
This task is closed and unheld.
Name | |
Spud date | 1990-06-06 |
Abandon date | |
Borehole orientation | Vertical |
Measured depth | 895.000 |
True vertical depth | |
Tperf | 481.000 |
Bperf | 770.000 |
Water geochem | |
No well data | |
Glog unavailable | |
Notes |
Service company | Schlumberger |
Tool | DUAL INDUCTION-SFL |
Date | 1990-06-07 |
Run number | ONE |
Driller depth | 883.000 |
Logger depth | 884.000 |
Log bottom | 878.000 |
Log top | 28.000 |
Casing size | 14.000 |
Bit size | 8.750 |
Mud type | GEL/CYPAN |
Mud density | 9.00 |
Mud visc (plastic) | |
Mud visc (funnel) | 41.00 |
Mud ph | 7.60 |
Mud fluid loss | 8.40 |
Sample source | FLOWLINE |
Circulation stopped time | 06:30:00 |
Logger on bottom time | 08:37:00 |
Time since circulation | |
Operating rig time | |
Notes | Fluid loss in C3 |
71945 | 2019-08-06 17:26 | ashley | CLOSED, UNHANDED |
71945 | 2019-08-06 17:26 | ashley | EDITED RUN ONE (June 7, 1990) |
71945 | 2019-08-06 17:21 | ashley | EDITED WELL METADATA |
71945 | 2019-08-06 17:14 | ashley | TAKEN |
71945 | 2018-12-17 09:25 | e.haugen | TASK CREATED |
47637 | 2018-08-21 17:56 | powen | CLOSED, UNHANDED |
47637 | 2018-08-21 17:56 | powen | EDITED RUN ONE (June 7, 1990) |
47637 | 2018-08-21 17:54 | powen | ADDED RUN ONE (June 7, 1990) |
47637 | 2018-08-21 17:50 | powen | EDITED WELL METADATA |
47637 | 2018-08-21 17:47 | powen | TAKEN |
47637 | 2018-08-01 11:06 | e.haugen | TASK CREATED |
Well 02985979