QC all data (well construction, run header, g-log curves, mud/temperature).
This task is open and unheld.
Name | |
Spud date | 1968-02-15 |
Abandon date | |
Borehole orientation | Vertical |
Measured depth | 752.000 |
True vertical depth | |
Tperf | 328.000 |
Bperf | 745.000 |
Water geochem | |
No well data | |
Glog unavailable | |
Notes |
Service company | GO WESTERN | GO WESTERN |
Tool | INDUCTION ELECTRIC LOG | INDUCTION ELECTRIC LOG |
Date | 1968-02-15 | 1968-02-16 |
Run number | ONE | TWO |
Driller depth | 423.000 | 771.000 |
Logger depth | 426.000 | 772.000 |
Log bottom | 425.000 | 766.000 |
Log top | 30.000 | 421.000 |
Casing size | 14.000 | 8.625 |
Bit size | 12.250 | 7.875 |
Mud type | CLAY BASE | CRUDE OIL |
Mud density | 70.00 | |
Mud visc (plastic) | 65.00 | |
Mud visc (funnel) | ||
Mud ph | ||
Mud fluid loss | ||
Sample source | CIRC | |
Circulation stopped time | ||
Logger on bottom time | ||
Time since circulation | ||
Operating rig time | ||
Notes |
72846 | 2018-12-17 09:25 | e.haugen | TASK CREATED |
48538 | 2018-09-25 07:50 | sgainer | CLOSED, UNHANDED |
48538 | 2018-09-25 07:50 | sgainer | ADDED RUN TWO (Feb. 16, 1968) |
48538 | 2018-09-25 07:48 | sgainer | EDITED RUN ONE (Feb. 15, 1968) |
48538 | 2018-09-25 07:48 | sgainer | ADDED RUN ONE (Feb. 15, 1968) |
48538 | 2018-09-25 07:47 | sgainer | EDITED WELL METADATA |
48538 | 2018-09-25 07:45 | sgainer | TAKEN |
48538 | 2018-08-01 11:06 | e.haugen | TASK CREATED |
Well 02940937