QC all data (well construction, run header, g-log curves, mud/temperature).
This task is open and unheld.
Name | |
Spud date | 1990-01-14 |
Abandon date | |
Borehole orientation | Vertical |
Measured depth | 1600.000 |
True vertical depth | |
Tperf | |
Bperf | |
Water geochem | |
No well data | |
Glog unavailable | |
Notes |
Service company | SCHLUMBERGER | SCHLUMBERGER |
Tool | DUAL INDUCTION SFL | COMPENSATED NEUTRON LITHO DENSITY |
Date | 1990-01-15 | 1990-01-16 |
Run number | One | One |
Driller depth | 1600.000 | 1600.000 |
Logger depth | 1600.000 | 1600.000 |
Log bottom | 1594.000 | 1597.000 |
Log top | 78.000 | 78.000 |
Casing size | 10.750 | |
Bit size | 8.500 | 8.500 |
Mud type | GEL/DRISPAC | GEL/DRISPAC |
Mud density | 9.00 | 9.00 |
Mud visc (plastic) | ||
Mud visc (funnel) | 40.00 | 40.00 |
Mud ph | ||
Mud fluid loss | ||
Sample source | FLOWLINE | FLOWLINE |
Circulation stopped time | 21:00:00 | 21:00:00 |
Logger on bottom time | 21:59:00 | 09:28:00 |
Time since circulation | ||
Operating rig time | ||
Notes | CASING SIZE: 10 3/, |
79557 | 2019-03-26 12:02 | ashley | CLOSED, UNHANDED |
79557 | 2019-03-26 12:01 | ashley | EDITED RUN One (Jan. 16, 1990) |
79557 | 2019-03-26 11:58 | ashley | EDITED RUN One (Jan. 15, 1990) |
79557 | 2019-03-26 11:56 | ashley | EDITED WELL METADATA |
79557 | 2019-03-26 11:54 | ashley | TAKEN |
79557 | 2019-03-16 09:02 | tsowers | TASK CREATED |
73040 | 2018-12-17 09:25 | e.haugen | TASK CREATED |
48732 | 2018-09-20 15:57 | Jbunch | CLOSED, UNHANDED |
48732 | 2018-09-20 15:57 | Jbunch | EDITED RUN One (Jan. 16, 1990) |
48732 | 2018-09-20 15:54 | Jbunch | ADDED RUN One (Jan. 16, 1990) |
48732 | 2018-09-20 15:51 | Jbunch | EDITED RUN One (Jan. 15, 1990) |
48732 | 2018-09-20 15:51 | Jbunch | ADDED RUN One (Jan. 15, 1990) |
48732 | 2018-09-20 15:48 | Jbunch | EDITED WELL METADATA |
48732 | 2018-09-20 15:45 | Jbunch | TAKEN |
48732 | 2018-08-01 11:06 | e.haugen | TASK CREATED |
Well 02985296