QC all data (well construction, run header, g-log curves, mud/temperature).
This task is open and unheld.
Name | |
Spud date | 1971-03-11 |
Abandon date | 2012-08-02 |
Borehole orientation | Vertical |
Measured depth | 1310.000 |
True vertical depth | |
Tperf | 750.000 |
Bperf | 1260.000 |
Water geochem | |
No well data | |
Glog unavailable | |
Notes |
Service company | GO INTERNATIONAL |
Tool | INDUCTION ELECTRICAL LOG |
Date | 1971-03-12 |
Run number | ONE |
Driller depth | 1310.000 |
Logger depth | 1310.000 |
Log bottom | 1309.000 |
Log top | 20.000 |
Casing size | 14.000 |
Bit size | 9.875 |
Mud type | GEL-WATER |
Mud density | 70.00 |
Mud visc (plastic) | 45.00 |
Mud visc (funnel) | |
Mud ph | |
Mud fluid loss | |
Sample source | CIRC |
Circulation stopped time | |
Logger on bottom time | |
Time since circulation | |
Operating rig time | |
Notes |
73092 | 2018-12-17 09:25 | e.haugen | TASK CREATED |
48784 | 2018-09-25 08:25 | sgainer | CLOSED, UNHANDED |
48784 | 2018-09-25 08:25 | sgainer | EDITED RUN ONE (March 12, 1971) |
48784 | 2018-09-25 08:24 | sgainer | ADDED RUN ONE (March 12, 1971) |
48784 | 2018-09-25 08:23 | sgainer | EDITED WELL METADATA |
48784 | 2018-09-25 08:18 | sgainer | TAKEN |
48784 | 2018-08-01 11:06 | e.haugen | TASK CREATED |
Well 02944630