QC all data (well construction, run header, g-log curves, mud/temperature).
This task is open and unheld.
Name | |
Spud date | 1971-05-18 |
Abandon date | 1990-08-30 |
Borehole orientation | Vertical |
Measured depth | 1254.000 |
True vertical depth | |
Tperf | 933.000 |
Bperf | 1095.000 |
Water geochem | |
No well data | |
Glog unavailable | |
Notes |
Service company | GO INTERNATIONAL |
Tool | INDUCTION ELECTRIC LOG |
Date | 1971-03-31 |
Run number | ONE |
Driller depth | 1254.000 |
Logger depth | 1253.000 |
Log bottom | 1252.000 |
Log top | 21.000 |
Casing size | 14.000 |
Bit size | 9.875 |
Mud type | CLAY BASE |
Mud density | 69.00 |
Mud visc (plastic) | 48.00 |
Mud visc (funnel) | |
Mud ph | |
Mud fluid loss | |
Sample source | CIRC. |
Circulation stopped time | |
Logger on bottom time | |
Time since circulation | |
Operating rig time | |
Notes |
79180 | 2019-03-21 10:45 | dakota | CLOSED, UNHANDED |
79180 | 2019-03-21 10:44 | dakota | EDITED RUN ONE (March 31, 1971) |
79180 | 2019-03-21 10:44 | dakota | EDITED WELL METADATA |
79180 | 2019-03-21 10:34 | dakota | TAKEN |
79180 | 2019-03-16 09:02 | tsowers | TASK CREATED |
73106 | 2018-12-17 09:25 | e.haugen | TASK CREATED |
48798 | 2018-09-18 21:35 | evanschmidt013 | CLOSED, UNHANDED |
48798 | 2018-09-18 21:35 | evanschmidt013 | EDITED RUN ONE (March 31, 1971) |
48798 | 2018-09-18 21:34 | evanschmidt013 | ADDED RUN ONE (March 31, 1971) |
48798 | 2018-09-18 21:31 | evanschmidt013 | EDITED WELL METADATA |
48798 | 2018-09-18 21:24 | evanschmidt013 | TAKEN |
48798 | 2018-08-01 11:06 | e.haugen | TASK CREATED |
Well 02944664