QC all data (well construction, run header, g-log curves, mud/temperature).
This task is open and unheld.
Name | |
Spud date | 1968-08-08 |
Abandon date | |
Borehole orientation | Vertical |
Measured depth | 900.000 |
True vertical depth | |
Tperf | 569.000 |
Bperf | 769.000 |
Water geochem | |
No well data | |
Glog unavailable | |
Notes |
Service company | GO WESTERN | GO WESTERN |
Tool | INDUCTION ELECTRIC LOG | INDUCTION ELECTRIC LOG |
Date | 1968-08-09 | 1968-08-10 |
Run number | ONE | TWO |
Driller depth | 665.000 | 900.000 |
Logger depth | 663.000 | 900.000 |
Log bottom | 662.000 | 895.000 |
Log top | 35.000 | 680.000 |
Casing size | 14.000 | 8.625 |
Bit size | 12.250 | 7.875 |
Mud type | CLAY BASE | CRUDE |
Mud density | 70.00 | 20.00 |
Mud visc (plastic) | 60.00 | |
Mud visc (funnel) | ||
Mud ph | ||
Mud fluid loss | ||
Sample source | CIRC. | |
Circulation stopped time | ||
Logger on bottom time | ||
Time since circulation | ||
Operating rig time | ||
Notes |
73158 | 2018-12-17 09:25 | e.haugen | TASK CREATED |
63698 | 2018-11-05 07:42 | e.haugen | TASK CREATED |
48850 | 2018-09-27 07:12 | sgainer | CLOSED, UNHANDED |
48850 | 2018-09-27 07:11 | sgainer | ADDED RUN TWO (Aug. 10, 1968) |
48850 | 2018-09-27 07:10 | sgainer | ADDED RUN ONE (Aug. 9, 1968) |
48850 | 2018-09-27 07:08 | sgainer | EDITED WELL METADATA |
48850 | 2018-09-27 07:07 | sgainer | TAKEN |
48850 | 2018-08-01 11:06 | e.haugen | TASK CREATED |
Well 02942238