QC all data (well construction, run header, g-log curves, mud/temperature).
This task is open and unheld.
Name | |
Spud date | 1963-01-28 |
Abandon date | 1963-02-18 |
Borehole orientation | Vertical |
Measured depth | 380.000 |
True vertical depth | |
Tperf | |
Bperf | |
Water geochem | |
No well data | |
Glog unavailable | |
Notes | NO PERFS |
Service company | SCHLUMBERGER |
Tool | INDUCTION ELECTRICAL LOG |
Date | 1963-01-30 |
Run number | ONE |
Driller depth | 380.000 |
Logger depth | 381.000 |
Log bottom | 380.000 |
Log top | 70.000 |
Casing size | |
Bit size | 6.750 |
Mud type | CLAY |
Mud density | |
Mud visc (plastic) | |
Mud visc (funnel) | |
Mud ph | |
Mud fluid loss | |
Sample source | |
Circulation stopped time | |
Logger on bottom time | |
Time since circulation | |
Operating rig time | 0.750 |
Notes |
79299 | 2019-03-26 10:16 | dakota | CLOSED, UNHANDED |
79299 | 2019-03-26 10:15 | dakota | EDITED RUN ONE (Jan. 30, 1963) |
79299 | 2019-03-26 10:14 | dakota | EDITED WELL METADATA |
79299 | 2019-03-26 10:12 | dakota | TAKEN |
79299 | 2019-03-16 09:02 | tsowers | TASK CREATED |
74144 | 2018-12-17 09:25 | e.haugen | TASK CREATED |
49836 | 2018-10-16 07:55 | sgainer | CLOSED, UNHANDED |
49836 | 2018-10-16 07:54 | sgainer | ADDED RUN ONE (Jan. 30, 1963) |
49836 | 2018-10-16 07:52 | sgainer | EDITED WELL METADATA |
49836 | 2018-10-16 07:49 | sgainer | TAKEN |
49836 | 2018-08-01 11:06 | e.haugen | TASK CREATED |
Well 02926631