QC all data (well construction, run header, g-log curves, mud/temperature).
This task is open and unheld.
Name | |
Spud date | 2005-06-28 |
Abandon date | |
Borehole orientation | Directional |
Measured depth | 1995.000 |
True vertical depth | 1113.010 |
Tperf | 1044.000 |
Bperf | 1170.000 |
Water geochem | |
No well data | |
Glog unavailable | |
Notes |
Service company | SCHLUMBERGER |
Tool | Platform Express 2"=100' Array Induction/SP/GR/Neutron/Density/EPT |
Date | 2005-06-29 |
Run number | ONE |
Driller depth | 1699.000 |
Logger depth | 1689.000 |
Log bottom | 1681.000 |
Log top | 50.000 |
Casing size | 12.000 |
Bit size | 9.875 |
Mud type | POLYAC/QUICK GEL |
Mud density | 9.60 |
Mud visc (plastic) | |
Mud visc (funnel) | 40.00 |
Mud ph | 8.50 |
Mud fluid loss | 6.60 |
Sample source | FLOWLINE |
Circulation stopped time | 16:30:00 |
Logger on bottom time | 19:00:00 |
Time since circulation | |
Operating rig time | |
Notes |
74176 | 2018-12-17 09:25 | e.haugen | TASK CREATED |
49868 | 2018-10-26 13:47 | ahowery | CLOSED, UNHANDED |
49868 | 2018-10-26 13:47 | ahowery | EDITED RUN ONE (June 29, 2005) |
49868 | 2018-10-26 13:47 | ahowery | EDITED RUN ONE (June 29, 2005) |
49868 | 2018-10-26 13:45 | ahowery | ADDED RUN ONE (June 29, 2005) |
49868 | 2018-10-26 13:40 | ahowery | EDITED WELL METADATA |
49868 | 2018-10-26 13:34 | ahowery | TAKEN |
49868 | 2018-08-01 11:06 | e.haugen | TASK CREATED |
Well 03027525