QC all data (well construction, run header, g-log curves, mud/temperature).
This task is open and unheld.
Name | |
Spud date | 1966-09-14 |
Abandon date | |
Borehole orientation | Vertical |
Measured depth | 1015.000 |
True vertical depth | |
Tperf | 552.000 |
Bperf | 1015.000 |
Water geochem | |
No well data | |
Glog unavailable | |
Notes |
Service company | GO WESTERN | GO WESTERN |
Tool | ELECTRIC LOG | ELECTRIC LOG |
Date | 1966-09-10 | 1966-09-10 |
Run number | 1 | 2 |
Driller depth | 450.000 | 1015.000 |
Logger depth | 451.000 | 1015.000 |
Log bottom | 450.000 | 1014.000 |
Log top | 85.000 | 405.000 |
Casing size | 14.000 | 8.625 |
Bit size | 12.250 | 7.875 |
Mud type | CLAY BASE | CLAY BASE |
Mud density | 71.00 | 70.00 |
Mud visc (plastic) | 45.00 | 43.00 |
Mud visc (funnel) | ||
Mud ph | ||
Mud fluid loss | ||
Sample source | PIT | CIRC. |
Circulation stopped time | ||
Logger on bottom time | ||
Time since circulation | ||
Operating rig time | ||
Notes |
74578 | 2018-12-17 09:25 | e.haugen | TASK CREATED |
62770 | 2018-11-05 07:42 | e.haugen | TASK CREATED |
50270 | 2018-10-19 12:46 | Jbunch | CLOSED, UNHANDED |
50270 | 2018-10-19 12:46 | Jbunch | EDITED RUN 2 (Sept. 10, 1966) |
50270 | 2018-10-19 12:46 | Jbunch | ADDED RUN 2 (Sept. 10, 1966) |
50270 | 2018-10-19 12:45 | Jbunch | EDITED RUN 1 (Sept. 10, 1966) |
50270 | 2018-10-19 12:44 | Jbunch | ADDED RUN 1 (Sept. 10, 1966) |
50270 | 2018-10-19 12:43 | Jbunch | EDITED WELL METADATA |
50270 | 2018-10-19 12:40 | Jbunch | TAKEN |
50270 | 2018-08-01 11:06 | e.haugen | TASK CREATED |
Well 02900074