QC all data (well construction, run header, g-log curves, mud/temperature).
This task is open and unheld.
Name | |
Spud date | 1948-04-28 |
Abandon date | 2017-02-10 |
Borehole orientation | Vertical |
Measured depth | 1040.000 |
True vertical depth | |
Tperf | 840.000 |
Bperf | 1033.000 |
Water geochem | |
No well data | |
Glog unavailable | |
Notes |
Service company | SCHLUMBERGER | SCHLUMBERGER |
Tool | ELECTRIC LOG | ELECTRIC LOG |
Date | 1948-04-30 | 1948-05-02 |
Run number | 1 | 2 |
Driller depth | 880.000 | 1040.000 |
Logger depth | 879.000 | 1041.000 |
Log bottom | 878.000 | 1040.000 |
Log top | 30.000 | 878.000 |
Casing size | ||
Bit size | 12.250 | |
Mud type | PYRE GEL | MT. POSO OIL |
Mud density | 77.00 | |
Mud visc (plastic) | 30.00 | |
Mud visc (funnel) | ||
Mud ph | ||
Mud fluid loss | ||
Sample source | ||
Circulation stopped time | ||
Logger on bottom time | ||
Time since circulation | ||
Operating rig time | 0.750 | |
Notes |
74918 | 2018-12-17 09:25 | e.haugen | TASK CREATED |
50610 | 2018-10-25 15:43 | eholmes | CLOSED, UNHANDED |
50610 | 2018-10-25 15:42 | eholmes | ADDED RUN 2 (May 2, 1948) |
50610 | 2018-10-25 15:39 | eholmes | ADDED RUN 1 (April 30, 1948) |
50610 | 2018-10-25 15:35 | eholmes | EDITED WELL METADATA |
50610 | 2018-10-25 15:30 | eholmes | TAKEN |
50610 | 2018-08-01 11:06 | e.haugen | TASK CREATED |
Well 02904126