QC all data (well construction, run header, g-log curves, mud/temperature).
This task is open and unheld.
Name | |
Spud date | 1949-03-14 |
Abandon date | 1957-11-09 |
Borehole orientation | Vertical |
Measured depth | 1645.000 |
True vertical depth | |
Tperf | |
Bperf | |
Water geochem | |
No well data | |
Glog unavailable | |
Notes |
Service company | SCHLUMBERGER |
Tool | ELECTRIC LOG |
Date | 1949-01-15 |
Run number | ONE |
Driller depth | 1645.000 |
Logger depth | 1646.000 |
Log bottom | |
Log top | |
Casing size | |
Bit size | 7.625 |
Mud type | GEL |
Mud density | 80.00 |
Mud visc (plastic) | 50.00 |
Mud visc (funnel) | |
Mud ph | |
Mud fluid loss | |
Sample source | |
Circulation stopped time | |
Logger on bottom time | |
Time since circulation | |
Operating rig time | |
Notes |
75123 | 2018-12-17 09:25 | e.haugen | TASK CREATED |
50815 | 2018-09-07 13:30 | ahowery | CLOSED, UNHANDED |
50815 | 2018-09-07 13:30 | ahowery | ADDED RUN ONE (Jan. 15, 1949) |
50815 | 2018-09-07 13:21 | ahowery | EDITED WELL METADATA |
50815 | 2018-09-07 13:12 | ahowery | TAKEN |
50815 | 2018-08-01 11:06 | e.haugen | TASK CREATED |
Well 02924004