QC all data (well construction, run header, g-log curves, mud/temperature).
This task is open and unheld.
Name | |
Spud date | 1968-03-05 |
Abandon date | 1990-10-07 |
Borehole orientation | Vertical |
Measured depth | 1705.000 |
True vertical depth | |
Tperf | 1629.000 |
Bperf | 1702.000 |
Water geochem | |
No well data | |
Glog unavailable | |
Notes |
Service company | WELEX |
Tool | INDUCTION ELECTRIC LOG |
Date | 1968-03-06 |
Run number | ONE |
Driller depth | 1650.000 |
Logger depth | 1649.000 |
Log bottom | 1644.000 |
Log top | 100.000 |
Casing size | 14.000 |
Bit size | 9.875 |
Mud type | CLAY BASE MUD |
Mud density | 78.00 |
Mud visc (plastic) | 50.00 |
Mud visc (funnel) | |
Mud ph | |
Mud fluid loss | 6.00 |
Sample source | CIRCULATED |
Circulation stopped time | |
Logger on bottom time | |
Time since circulation | |
Operating rig time | |
Notes |
75221 | 2018-12-17 09:25 | e.haugen | TASK CREATED |
50913 | 2018-11-06 07:48 | sgainer | CLOSED, UNHANDED |
50913 | 2018-11-06 07:48 | sgainer | EDITED RUN ONE (March 6, 1968) |
50913 | 2018-11-06 07:48 | sgainer | EDITED RUN ONE (March 6, 1968) |
50913 | 2018-11-06 07:47 | sgainer | ADDED RUN ONE (March 6, 1968) |
50913 | 2018-11-06 07:45 | sgainer | EDITED WELL METADATA |
50913 | 2018-11-06 07:42 | sgainer | TAKEN |
50913 | 2018-08-01 11:06 | e.haugen | TASK CREATED |
Well 02942015