QC all data (well construction, run header, g-log curves, mud/temperature).
This task is open and unheld.
Name | |
Spud date | 1978-03-06 |
Abandon date | |
Borehole orientation | Vertical |
Measured depth | 1223.000 |
True vertical depth | |
Tperf | 939.000 |
Bperf | 1030.000 |
Water geochem | |
No well data | |
Glog unavailable | |
Notes |
Service company | GEARHART-OWEN |
Tool | INDUCTION ELECTRICAL LOG |
Date | 1978-03-07 |
Run number | ONE |
Driller depth | 1223.000 |
Logger depth | 1223.000 |
Log bottom | 1222.000 |
Log top | 18.000 |
Casing size | 12.000 |
Bit size | 8.750 |
Mud type | GEL |
Mud density | 10.40 |
Mud visc (plastic) | 68.00 |
Mud visc (funnel) | |
Mud ph | |
Mud fluid loss | |
Sample source | FLOWLINE |
Circulation stopped time | |
Logger on bottom time | |
Time since circulation | 1.000 |
Operating rig time | |
Notes |
75348 | 2018-12-17 09:25 | e.haugen | TASK CREATED |
51040 | 2018-12-12 13:07 | ashley | CLOSED, UNHANDED |
51040 | 2018-12-12 13:07 | ashley | EDITED RUN ONE (March 7, 1978) |
51040 | 2018-12-12 12:51 | ashley | EDITED WELL METADATA |
51040 | 2018-12-12 12:49 | ashley | EDITED WELL METADATA |
51040 | 2018-12-12 12:30 | ashley | TAKEN, REOPENED |
63631 | 2018-11-05 07:42 | e.haugen | TASK CREATED |
51040 | 2018-10-26 08:25 | evanschmidt013 | CLOSED, UNHANDED |
51040 | 2018-10-26 08:25 | evanschmidt013 | EDITED RUN ONE (March 7, 1978) |
51040 | 2018-10-26 08:24 | evanschmidt013 | ADDED RUN ONE (March 7, 1978) |
51040 | 2018-10-26 08:23 | evanschmidt013 | EDITED WELL METADATA |
51040 | 2018-10-26 08:21 | evanschmidt013 | TAKEN |
51040 | 2018-08-01 11:06 | e.haugen | TASK CREATED |
Well 02956611