QC all data (well construction, run header, g-log curves, mud/temperature).
This task is open and unheld.
Name | |
Spud date | 1994-06-04 |
Abandon date | |
Borehole orientation | Directional |
Measured depth | 986.000 |
True vertical depth | 74.000 |
Tperf | 266.000 |
Bperf | 860.000 |
Water geochem | |
No well data | |
Glog unavailable | |
Notes |
Service company | SCHLUMBERGER | SCHLUMBERGER |
Tool | DUAL INDUCTION SFL | COMPENSATED NEUTRON LITHO DENSITY LOG |
Date | 1994-06-05 | 1994-06-05 |
Run number | ONE | ONE |
Driller depth | 986.000 | 986.000 |
Logger depth | 987.000 | 987.000 |
Log bottom | 981.000 | 953.000 |
Log top | 42.000 | 42.000 |
Casing size | 10.750 | 10.750 |
Bit size | 9.875 | 9.875 |
Mud type | GEL | GEL |
Mud density | 9.10 | 9.10 |
Mud visc (plastic) | ||
Mud visc (funnel) | 45.00 | 45.00 |
Mud ph | ||
Mud fluid loss | ||
Sample source | FLOWLINE | FLOWLINE |
Circulation stopped time | 00:30:00 | 00:30:00 |
Logger on bottom time | 01:30:00 | 01:30:00 |
Time since circulation | ||
Operating rig time | ||
Notes |
75373 | 2018-12-17 09:25 | e.haugen | TASK CREATED |
51065 | 2018-11-05 10:36 | ahowery | CLOSED, UNHANDED |
51065 | 2018-11-05 10:35 | ahowery | EDITED RUN ONE (June 5, 1994) |
51065 | 2018-11-05 10:35 | ahowery | EDITED RUN ONE (June 5, 1994) |
51065 | 2018-11-05 10:33 | ahowery | ADDED RUN ONE (June 5, 1994) |
51065 | 2018-11-05 10:31 | ahowery | EDITED RUN ONE (June 5, 1994) |
51065 | 2018-11-05 10:30 | ahowery | EDITED RUN ONE (June 5, 1994) |
51065 | 2018-11-05 10:29 | ahowery | ADDED RUN ONE (June 5, 1994) |
51065 | 2018-11-05 10:25 | ahowery | EDITED WELL METADATA |
51065 | 2018-11-05 10:19 | ahowery | TAKEN |
61042 | 2018-11-05 07:42 | e.haugen | TASK CREATED |
51065 | 2018-08-01 11:06 | e.haugen | TASK CREATED |
Well 03002052