QC all data (well construction, run header, g-log curves, mud/temperature).
This task is closed and unheld.
Name | |
Spud date | 1974-06-24 |
Abandon date | |
Borehole orientation | Vertical |
Measured depth | 2140.000 |
True vertical depth | |
Tperf | 2065.000 |
Bperf | 2140.000 |
Water geochem | |
No well data | |
Glog unavailable | |
Notes |
Service company | GO INTERNATIONAL |
Tool | INDUCTION ELECTRICAL LOG |
Date | 1974-06-28 |
Run number | ONE |
Driller depth | 2140.000 |
Logger depth | 2141.000 |
Log bottom | 2140.000 |
Log top | 25.000 |
Casing size | |
Bit size | 9.875 |
Mud type | GEL BASE |
Mud density | |
Mud visc (plastic) | |
Mud visc (funnel) | |
Mud ph | |
Mud fluid loss | |
Sample source | CIRC. |
Circulation stopped time | |
Logger on bottom time | |
Time since circulation | 1.500 |
Operating rig time | |
Notes |
80120 | 2019-03-29 12:57 | ashley | CLOSED, UNHANDED |
80120 | 2019-03-29 12:57 | ashley | EDITED RUN ONE (June 28, 1974) |
80120 | 2019-03-29 12:55 | ashley | EDITED WELL METADATA |
80120 | 2019-03-29 12:52 | ashley | TAKEN |
80120 | 2019-03-28 15:54 | tsowers | TASK CREATED |
67703 | 2018-12-20 17:17 | Jbunch | CLOSED, UNHANDED |
67703 | 2018-12-20 17:17 | Jbunch | EDITED RUN ONE (June 28, 1974) |
67703 | 2018-12-20 17:14 | Jbunch | ADDED RUN ONE (June 28, 1974) |
67703 | 2018-12-20 17:13 | Jbunch | EDITED WELL METADATA |
67703 | 2018-12-20 17:09 | Jbunch | TAKEN |
67703 | 2018-12-07 12:02 | e.haugen | TASK CREATED |
Well 02949244