QC all data (well construction, run header, g-log curves, mud/temperature).
This task is closed and unheld.
Name | |
Spud date | 1972-02-17 |
Abandon date | 2014-07-11 |
Borehole orientation | Vertical |
Measured depth | 1200.000 |
True vertical depth | |
Tperf | 1156.000 |
Bperf | 1196.000 |
Water geochem | |
No well data | |
Glog unavailable | |
Notes |
Service company | GO INTERNATIONAL |
Tool | INDUCTION ELECTRICAL LOG |
Date | 1972-02-18 |
Run number | ONE |
Driller depth | 1204.000 |
Logger depth | 1204.000 |
Log bottom | 1203.000 |
Log top | 23.000 |
Casing size | 15.000 |
Bit size | 9.875 |
Mud type | GEL-H2O |
Mud density | |
Mud visc (plastic) | |
Mud visc (funnel) | |
Mud ph | |
Mud fluid loss | |
Sample source | CIRC |
Circulation stopped time | |
Logger on bottom time | |
Time since circulation | |
Operating rig time | |
Notes |
80213 | 2019-04-04 10:43 | dakota | CLOSED, UNHANDED |
80213 | 2019-04-04 10:43 | dakota | EDITED RUN ONE (Feb. 18, 1972) |
80213 | 2019-04-04 10:42 | dakota | EDITED WELL METADATA |
80213 | 2019-04-04 10:34 | dakota | TAKEN |
80213 | 2019-03-28 15:54 | tsowers | TASK CREATED |
67645 | 2018-12-27 11:36 | ahowery | CLOSED, UNHANDED |
67645 | 2018-12-27 11:35 | ahowery | EDITED RUN ONE (Feb. 18, 1972) |
67645 | 2018-12-27 11:34 | ahowery | ADDED RUN ONE (Feb. 18, 1972) |
67645 | 2018-12-27 11:28 | ahowery | EDITED WELL METADATA |
67645 | 2018-12-27 11:26 | ahowery | TAKEN |
67645 | 2018-12-07 12:02 | e.haugen | TASK CREATED |
Well 02946598