QC all data (well construction, run header, g-log curves, mud/temperature).
This task is closed and unheld.
Name | |
Spud date | 1977-08-30 |
Abandon date | 1998-01-06 |
Borehole orientation | Vertical |
Measured depth | 1765.000 |
True vertical depth | |
Tperf | 1740.000 |
Bperf | 1765.000 |
Water geochem | |
No well data | |
Glog unavailable | |
Notes |
Service company | WELEX |
Tool | INDUCTION ELECTRIC LOG |
Date | 1977-09-01 |
Run number | ONE |
Driller depth | 1765.000 |
Logger depth | 1765.000 |
Log bottom | 1759.000 |
Log top | 40.000 |
Casing size | 10.750 |
Bit size | 9.875 |
Mud type | CLAY BASE |
Mud density | 68.00 |
Mud visc (plastic) | 45.00 |
Mud visc (funnel) | |
Mud ph | 8.00 |
Mud fluid loss | 7.40 |
Sample source | CIRCULATED |
Circulation stopped time | |
Logger on bottom time | |
Time since circulation | 1.500 |
Operating rig time | |
Notes |
81091 | 2019-05-04 14:37 | dakota | CLOSED, UNHANDED |
81091 | 2019-05-04 14:36 | dakota | EDITED RUN ONE (Sept. 1, 1977) |
81091 | 2019-05-04 14:35 | dakota | EDITED WELL METADATA |
81091 | 2019-05-04 14:34 | dakota | TAKEN |
81091 | 2019-03-28 15:54 | tsowers | TASK CREATED |
67776 | 2018-12-27 12:07 | ahowery | CLOSED, UNHANDED |
67776 | 2018-12-27 12:07 | ahowery | EDITED RUN ONE (Sept. 1, 1977) |
67776 | 2018-12-27 12:06 | ahowery | ADDED RUN ONE (Sept. 1, 1977) |
67776 | 2018-12-27 12:02 | ahowery | EDITED WELL METADATA |
67776 | 2018-12-27 11:59 | ahowery | TAKEN |
67776 | 2018-12-07 12:02 | e.haugen | TASK CREATED |
Well 02956181