LOG IN / HELP

<<< BACK TO JOB

Wilmington 1: 23721338

Enter:
(1) Well metadata for each well, if missing.
(2) Run metadata for each run.
(3) Log curve descriptions for each run.
(4) Temperature and resistivity observations for each run.

This task is closed and unheld.

See DOGGR well records.

Well construction

Name
Spud date 1972-12-24
Abandon date
Borehole orientation Directional
Measured depth 5301.000
True vertical depth 3535.290
Tperf 4446.000
Bperf 4705.000
Water geochem
No well data
Glog unavailable
Notes

Run headers

Service company Schlumberger Schlumberger Schlumberger
Tool INDUCTION-ELECTICAL LOG INDUCTION-ELECTICAL LOG PLATFORM EXPRESS ARRAY INDUCTION-GR-SP 2IN & 5IN MD
Date 1973-01-04 1973-01-08 2013-08-30
Run number ONE TWO ONE
Driller depth 4556.000 4740.000 5301.000
Logger depth 4564.000 4742.000 5301.000
Log bottom 4588.000 4741.000 5302.000
Log top 1142.000 4522.000 3486.000
Casing size 13.375 8.625 8.625
Bit size 12.250 7.625 8.500
Mud type FGM FGM KCl/Polymer
Mud density 72.00 71.00 11.30
Mud visc (plastic) 48.00 42.00
Mud visc (funnel) 53.00
Mud ph 8.00 8.50
Mud fluid loss 7.40 5.40 3.60
Sample source PIT CIRCULATED MUD TANK
Circulation stopped time 08:00:00
Logger on bottom time 10:30:29
Time since circulation 2.000 3.000
Operating rig time
Notes

G-log curves

1973-01-04 ONE
6FF40 INDUCTION CONDUCTIVITY
A-16"-M SHORT NORMAL
INDUCTION
SPONTANEOUS POTENTIAL
1973-01-08 TWO
6FF40 INDUCTION CONDUCTIVITY
A-16"-M SHORT NORMAL
INDUCTION
SPONTANEOUS POTENTIAL
2013-08-30 ONE
Array Induction Four Foot Conductivity A90 (AFCO90) AIT-M
Array Induction Four Foot Resistivity A10 (AF10) AIT-M
Array Induction Four Foot Resistivity A20 (AF20) AIT-M
Array Induction Four Foot Resistivity A30 (AF30) AIT-M
Array Induction Four Foot Resistivity A60 (AF60) AIT-M
Array Induction Four Foot Resistivity A90 (AF90) AIT-M
Bit Size (BS)
Cable Tension (TENS)
Gamma Ray (GR) EDTC-B
Hole Diameter 1 (HD1) PPC-B
Hole Diameter 2 (HD2) PPC-B
Spontaneous Potential (SP) AIT-M

Temperature and mud resistivity observations

1973-01-04 ONE
Rm = 2.000 Ωm @ 116.000 °F (MRT, 4564.000 ft)
Rmc = 1.600 Ωm @ 116.000 °F (MRT, 4564.000 ft)
Rm = 3.540 Ωm @ 65.000 °F
Rmf = 2.670 Ωm @ 75.000 °F
1973-01-08 TWO
Rm = 1.020 Ωm @ 118.000 °F (MRT, 4742.000 ft)
Rm = 1.280 Ωm @ 85.000 °F
Rmc = 2.470 Ωm @ 55.000 °F
Rmf = 1.250 Ωm @ 55.000 °F
2013-08-30 ONE
Rm = 0.130 Ωm @ 84.600 °F
Rm = 0.080 Ωm @ 143.800 °F
Rmc = 0.200 Ωm @ 84.500 °F
Rmf = 0.060 Ωm @ 143.800 °F
Rmf = 0.110 Ωm @ 84.300 °F

Change log


89997 2019-08-26 10:32 ashley CLOSED, UNHANDED
89997 2019-08-26 10:30 ashley EDITED RUN ONE (Aug. 30, 2013)
89997 2019-08-26 10:21 ashley EDITED RUN ONE (Aug. 30, 2013)
89997 2019-08-26 10:19 ashley ADDED RUN ONE (Aug. 30, 2013)
89997 2019-08-26 10:06 ashley EDITED RUN TWO (Jan. 8, 1973)
89997 2019-08-23 17:34 ashley EDITED RUN ONE (Jan. 4, 1973)
89997 2019-08-23 17:22 ashley EDITED WELL METADATA
89997 2019-08-23 17:05 ashley TAKEN
89997 2019-08-23 11:52 tsowers TASK CREATED
85878 2019-07-02 13:03 haleycourser CLOSED, UNHANDED
85878 2019-07-02 13:03 haleycourser EDITED WELL METADATA
85878 2019-07-02 12:58 haleycourser EDITED RUN TWO (Jan. 8, 1973)
85878 2019-07-02 12:57 haleycourser ADDED RUN TWO (Jan. 8, 1973)
85878 2019-07-02 12:54 haleycourser EDITED RUN ONE (Jan. 4, 1973)
85878 2019-07-02 12:52 haleycourser ADDED RUN ONE (Jan. 4, 1973)
85878 2019-07-02 12:49 haleycourser EDITED WELL METADATA
85878 2019-07-02 12:27 haleycourser TAKEN
85878 2019-06-19 12:38 tsowers TASK CREATED

Well versions and related tasks

Well 23721338