Create runs and enter run metadata, g-log metadata, and temperature and mud observations. Do not enter any well metadata.
This task is closed and unheld.
Name | |
Spud date | 2006-01-03 |
Abandon date | |
Borehole orientation | Directional |
Measured depth | 2860.000 |
True vertical depth | 2836.950 |
Tperf | |
Bperf | |
Water geochem | |
No well data | |
Glog unavailable | |
Notes | Active well; Observation converted into injection |
Service company | Halliburton |
Tool | HIGH RESOLUTION INDUCTION LOG 2"=100' |
Date | 2006-01-08 |
Run number | ONE |
Driller depth | 2860.000 |
Logger depth | 2860.000 |
Log bottom | 2850.000 |
Log top | 418.000 |
Casing size | 10.750 |
Bit size | 9.875 |
Mud type | MI-GEL |
Mud density | 9.30 |
Mud visc (plastic) | 41.00 |
Mud visc (funnel) | |
Mud ph | 8.10 |
Mud fluid loss | 5.60 |
Sample source | FLOWLINE |
Circulation stopped time | |
Logger on bottom time | 15:45:00 |
Time since circulation | 10.000 |
Operating rig time | |
Notes |
28073 | 2018-02-06 10:35 | ashley | CLOSED, UNHANDED |
28073 | 2018-02-06 10:35 | ashley | EDITED RUN ONE (Jan. 8, 2006) |
28073 | 2018-02-06 10:33 | ashley | EDITED WELL METADATA |
28073 | 2018-02-06 10:28 | ashley | TAKEN |
28073 | 2018-01-10 16:23 | whdc | TASK CREATED |
25993 | 2018-01-09 14:49 | SHAREPOINT IMPORT (mu2) spud_date,measured_depth,water_geochem,borehole_orientation,notes | |
25993 | 2018-01-09 14:49 | TASK CREATED | |
9119 | 2017-12-25 20:13 | HLoss1 | CLOSED, UNHANDED |
9119 | 2017-12-25 20:12 | HLoss1 | EDITED RUN ONE (Jan. 8, 2006) |
9119 | 2017-12-25 20:11 | HLoss1 | ADDED RUN ONE (Jan. 8, 2006) |
9119 | 2017-12-25 20:09 | HLoss1 | TAKEN |
9119 | 2017-10-05 09:53 | mloustale | TASK CREATED |
25993 | 2017-04-08 00:53 | ashley | CHECKED WELL METADATA (SHAREPOINT) |
25993 | 2017-04-08 00:53 | sharepoint-LR | EDITED WELL METADATA (SHAREPOINT) |
Well 03029133