Well construction data was imported from SharePoint, and may conflict with what was already in this database. Look for change log entries with CONFLICT and resolve each conflict. Make a note in the change log if there is an interesting reason for the conflict.
This task is closed and unheld.
Name | |
Spud date | 1960-08-19 |
Abandon date | |
Borehole orientation | Vertical |
Measured depth | 4928.000 |
True vertical depth | |
Tperf | 4008.000 |
Bperf | 4746.000 |
Water geochem | |
No well data | |
Glog unavailable | |
Notes | Idle well; Production converted into injection |
Service company | Welex |
Tool | INDUCTION-FORXO LOG |
Date | 1960-08-31 |
Run number | ONE |
Driller depth | 4928.000 |
Logger depth | 4932.000 |
Log bottom | 4930.000 |
Log top | 2500.000 |
Casing size | 9.625 |
Bit size | 8.750 |
Mud type | Oil Emul. |
Mud density | 71.00 |
Mud visc (plastic) | 45.00 |
Mud visc (funnel) | |
Mud ph | |
Mud fluid loss | |
Sample source | CIRCULATED |
Circulation stopped time | |
Logger on bottom time | |
Time since circulation | |
Operating rig time | |
Notes |
10869 | 2017-12-08 12:50 | ashley | CLOSED, UNHANDED |
10869 | 2017-12-08 12:50 | ashley | EDITED RUN ONE (Aug. 31, 1960) |
10869 | 2017-12-08 12:46 | ashley | EDITED WELL METADATA |
10869 | 2017-12-08 12:41 | ashley | TAKEN |
10869 | 2017-11-29 08:38 | whdc | TASK CREATED |
9705 | 2017-10-26 15:32 | SHAREPOINT IMPORT (mu2) spud_date,tperf,measured_depth,water_geochem,borehole_orientation,notes | |
9705 | 2017-10-26 15:32 | TASK CREATED | |
3719 | 2017-10-13 10:15 | hannaho | CLOSED, UNHANDED |
3719 | 2017-10-13 10:14 | hannaho | EDITED RUN ONE (Aug. 31, 1960) |
3719 | 2017-10-13 10:14 | hannaho | ADDED RUN ONE (Aug. 31, 1960) |
3719 | 2017-10-13 10:01 | hannaho | TAKEN |
3719 | 2017-10-02 11:18 | mloustale | TASK CREATED |
9705 | 2016-12-21 23:53 | ashley | CHECKED WELL METADATA (SHAREPOINT) |
9705 | 2016-12-21 23:53 | sharepoint-RMB | EDITED WELL METADATA (SHAREPOINT) |
Well 08302225