Well construction data was imported from SharePoint, and may conflict with what was already in this database. Look for change log entries with CONFLICT and resolve each conflict. Make a note in the change log if there is an interesting reason for the conflict.
This task is closed and unheld.
Name | |
Spud date | 2010-03-26 |
Abandon date | |
Borehole orientation | Vertical |
Measured depth | 1870.000 |
True vertical depth | |
Tperf | 802.000 |
Bperf | 1537.000 |
Water geochem | |
No well data | |
Glog unavailable | |
Notes | Active well |
Service company | halliburton |
Tool | HIGH RES INDUCTION SPECTRAL DENSITY DUAL SPACED NEUTRON |
Date | 2010-03-30 |
Run number | ONE |
Driller depth | 1870.000 |
Logger depth | 1866.000 |
Log bottom | 1856.000 |
Log top | 40.000 |
Casing size | 16.000 |
Bit size | 6.750 |
Mud type | GEL/PAC |
Mud density | 8.60 |
Mud visc (plastic) | 44.00 |
Mud visc (funnel) | |
Mud ph | 6.70 |
Mud fluid loss | 8.00 |
Sample source | MEAS |
Circulation stopped time | 20:30:00 |
Logger on bottom time | 23:00:00 |
Time since circulation | |
Operating rig time | |
Notes |
10464 | 2017-11-29 17:22 | ashley | CLOSED, UNHANDED |
10464 | 2017-11-29 17:22 | ashley | EDITED RUN ONE (March 30, 2010) |
10464 | 2017-11-29 17:15 | ashley | EDITED WELL METADATA |
10464 | 2017-11-29 17:10 | ashley | TAKEN |
10464 | 2017-11-29 08:38 | whdc | TASK CREATED |
9808 | 2017-10-26 15:32 | SHAREPOINT IMPORT (mu2) spud_date,tperf,measured_depth,water_geochem,borehole_orientation,notes | |
9808 | 2017-10-26 15:32 | TASK CREATED | |
4089 | 2017-10-19 16:44 | ellie | CLOSED, UNHANDED |
4089 | 2017-10-19 16:44 | ellie | ADDED RUN ONE (March 30, 2010) |
4089 | 2017-10-19 16:35 | ellie | TAKEN |
4089 | 2017-10-19 16:34 | fatimaburhan | UNHANDED |
4089 | 2017-10-19 16:32 | fatimaburhan | TAKEN |
4089 | 2017-10-02 11:18 | mloustale | TASK CREATED |
9808 | 2016-12-22 23:53 | ashley | CHECKED WELL METADATA (SHAREPOINT) |
9808 | 2016-12-22 23:53 | ashley | EDITED WELL METADATA (SHAREPOINT) |
Well 08322588