Input all Well Construction data
BE SURE TO INPUT TOP PRODUCING PERF NOT INJECTING
Enter:
(1) Well metadata for each well, if missing.
(2) Run metadata for each run.
(3) Log curve descriptions for each run.
(4) Temperature and resistivity observations for each run.