Collect all well construction and geophysical log data as per usual.
If you encounter an API with data already filled out, close the log. It has been done before and QC'd already.
Enter:
(1) Well metadata for each well, if missing.
(2) Run metadata for each run.
(3) Log curve descriptions for each run.
(4) Temperature and resistivity observations for each run.